    The Project at a Glance

    Download
    [table id=6 /]

    In 2011, Bloomberg LP—a leading provider of global business information, financial information, and news—signed a lease at 120 Park Avenue to accommodate the company’s growth. A critical factor in selecting Bloomberg LP’s new space was to capture the company’s core values and culture, including a commitment to sustainability within its entire real estate portfolio. Bloomberg LP often receives the highest green building accolades for its spaces worldwide.

    Bloomberg LP was familiar with the whole-building energy efficiency retrofit at the Empire State Building and chose to enlist consultants to use the Tenant Energy Optimization process to analyze and make energy efficiency recommendations in the design and construction of the floor 16 space. The process is a proven, replicable approach that integrates energy efficiency into tenant space design and construction and delivers excellent financial returns through energy conservation.

    [table id=7 /]

    Executing the Process

    Design and Construction

    Bloomberg LP assembled many of the practitioners developing the Tenant Energy Optimization process with other tenants in New York City to be a part of its own project team.

    The team outlined energy performance goals that aligned with Bloomberg LP’s overall corporate sustainability targets and developed an extensive list of energy performance measures (EPMs) to be considered for implementation into the final buildout. EPMs are technologies and systems that aim to reduce energy use through efficiency and conservation. They are also frequently referred to as energy conservation measures (ECMs).

    Some of the most important factors Bloomberg LP wanted included in the floor 16 buildout were the following:

    • A reduction in energy associated with lighting power;
    • An open office design that allows all employees to have window views;
    • Heating and air conditioning comfort, control, and efficiency during work hours and after hours;
    • Computer energy management; and
    • High-quality and user-friendly design.

    Using energy performance modeling, incremental costing information, and cost savings projections, the team was able to choose a package of EPMs that would meet the company’s energy and financial goals.

    The EPMs implemented in Bloomberg LP’s space on floor 16 include the following:

    [table id=9 /]

    Measurement and Verification

    [table id=8 /]

    After completion of the buildout, the energy team returned to Bloomberg LP’s space to perform measurement and verification (M&V) to ensure that the implemented EPMs were performing as intended. Initial M&V was conducted over the course of a ten-day period, once the space was fully occupied and operational.

    Areas where design features were performing as intended:

    • High-efficiency lighting was implemented successfully, as evidenced by the overall lighting power density that was measured at 0.824 watts per square foot, slightly better than the design projections of 0.889 watts per square foot.
    • Daylight harvesting controls were observed to be operated effectively, based on lighting power profiles that are consistent with time-of-day and weather conditions.
    • NightWatchman software reduced equipment power density of connected plug loads during overnight hours by 15 percent. This is less than the typical reduction of 50 percent because Bloomberg LP has a significant amount of critical computing equipment that cannot be shut down during unoccupied hours and therefore cannot be connected to the software.

    Areas for further improvement:

    • The energy project team determined that further energy savings may be possible by reconsidering overnight conditioning of floor 16 to reduce the use of mechanical duct bridging. At the time of the M&V period, however, overnight cooling was assumed to be necessary because of the sporadic nature of off-hours occupancy.

    Post-Project Actions

    Bloomberg LP remains committed to sustainability and has achieved a 22 percent reduction in energy associated with lighting power across its 4.5 million-square-foot real estate portfolio. Specifically regarding the floor 16 buildout, Bloomberg LP continues to track and report its energy use internally to senior management.